MOORESVILLE INTERMEDIATE SCHOOL

MOORESVILLE, NC 28115

PROJECT DESCRIPTION:

AdvantaClean was contracted by Beam Construction Company to perform multiple environmental services at Mooresville Intermediate School

  • The school had a sprinkler pipe leak causing water damage to the gymnasium and stage floors. Mold was discovered under the floor.
  • The scope of work for this project included removing the gymnasium and stage floating floor system. This flooring consisted of ¾ wood floor fastened to multiple layers of plywood and 2x4 material.
  • All areas were cleaned, HEPA vacuumed and disinfected.