AdvantaClean of Greater Hartford Case Studies

Schedule an Appointment

To request a service call you only need to fill out the form below. We will contact you via phone, email, or text to confirm the best appointment time. You will receive an email confirming your service request.

Call now!

Success Stories

Location: West Hartford, CT 06108

Problem: 2nd-floor unit kitchen sink drain failure, water damage to kitchen and bedroom in the unit below.

Solution: Wall removal, 2 sets of kitchen cabinets removed, structural drying, disinfecting, restore walls, and replacement cabinets in 2 units.

WaterDamageFirst1.jpg WaterDamageSecond1.jpg 

Location: Bloomfield, CT 06108

Problem: There were multiple known cases amongst employees at this large business's mailroom. They wanted to control the virus spread. We arrived within 2 hrs., performed certified decontamination of the adjacent offices and mailroom.

Solution: Applied sanitizing chemicals on high and low touch point surfaces. Fogged the room.

DecontaminationFirst2.jpg DecontaminationSecond2.jpg

Location: Enfield, CT 06108

Problem: 30 yr old property, insulation in lower corners of the exterior have an air leak. The temperature differential cause condensation to develop in these locations. Combined with general dust mold forms over time. Central air also requires duct cleaning from lack of main3.

Solution: Damaged drywall removed and replaced. HEPA vacuum and damp-wipe clean entire home, upholstery clean blinds, curtains, couches, and chairs. Antimicrobial fogging of the interior.

HomeInteriorFirst3.jpg HomeInteriorSecond3.jpg      

Location: Hartford, CT 06101

Problem: Mold developed due to damaged gutters, water infiltrated brick, and foundation wall.
Moisture developing near floor and wall joint, leaking into a stairwell started mold growth on drywall. Decades of dust build-up from walls eroding, and dirt from gardening supplies.

Solution: AdvantaClean technicians set up containment, HEPA air filtration systems, HEPA vacuums, and respiratory protection to collect debris and dust. Removed damaged wood and drywall as well as other contaminated debris in the basement. They brushed structural surfaces, damp wiped mechanicals and piping, and a 100% biodegradable peroxide spray treatment was applied by an airless pressure sprayer.

BasementFirst4.jpg BasementSecond4.jpg

BasementThird4.jpg BasementFourth4.jpg    

Location: Middletown, CT 6457

Problem: Single Woman and Grandmother inherited an apartment that had for years been left in poor condition. There were signs of hoarding, water damage, and mold throughout 3 floors of the condominium unit.

Solution: Within 2 days of being hired, we were able to start the project. The crew worked 5 days straight to complete the project remediation project. We removed debris and old items left behind including damaged bathroom and kitchen cabinets, appliances, carpeting, and water damaged sheetrock from walls and ceilings. Items were separated according to the customers demands, and debris was bagged and removed from the home. During the work, employees wore filtered face masks, and we ran HEPA filtered air scrubbers throughout the cleaning and remediation activities. Once demolition and cleanup was done, anti-microbial chemicals were used to clean and disinfect all of the surfaces and contents that remained. After, the ductwork and air handler were cleaned throughout.

MitigationFirst5.jpg MitigationSecond5.jpg

MitigationThird5.jpg MitigationFourth5.jpg  

Location: Lansing, MI 48933

Problem: Sometimes, as a result of flooding, excessive humidity, soil pressures, and poor construction material, a foundation may become deteriorated beyond repair.

Under these conditions, the only options that are generally available would be to excavate under the home and rebuild the foundation. This option is rarely cost-effective and the home is usually condemned.

Solution: Scope of project is to cost-effectively install a new reinforced foundation in front of the existing old foundation which is crumbling due to deterioration of mortar and block themselves.

Material Used: Fortress Pre-Cured Pre-Preg Grid Mesh

Design was based on shotcrete pool design, combined with a cantilever load of building. In short design used current foundation as backfill for new foundation. The floor was removed for interior system. Spread footer was increased to accept new wall. 4'X 8' sections of Fortress Carbon Grid were hung off of new sill plate. Drainage board was installed against old foundation. (becoming sandwiched between old and new foundation). Then a 6" shotcrete wall was shot creating a brand new basement interior. Total job completed in 5 days.

FoundationFirst6.jpg FoundationSecond6.jpg

FoundationThird6.jpg FoundationFourth6.jpg

AdvantaClean Systems, Inc. uses cookies. Cookies help track user website behavior for functionality, analytics, and marketing and may share your information with third parties. By visiting this website you agree to our use of cookies. Find out more here.